Any items require maintenance to prolong
its service life, and now I will introduce the injection mold maintenance steps
below.
Responsible
business should first understand the basic situation of the mold, as first
deputy dies should give each card with biographical detail records, statistics
of its use, care (lubrication, cleaning, rust) and damage, which can be found
whereby parts, components have been damage, wear extent size to provide
discovery and problem-solving information, and molding process parameters of
the mold, the product of the materials used to shorten the mold test time and
increase productivity.
Processing
enterprises should be under the injection molding machine, mold normal
operation, the test performance of various molds and molded plastic parts last
measured dimension, you can determine the current state of the mold through the
information to find out the cavity, core cooling systems and sub-surface
damage, such as where, according to information provided by the plastic parts,
you can determine the status of the mold damage and repair measures.
To die several
important parts to focus track testing: top out, the role of the guide member
is to ensure that the opening and closing movement of the mold and the top of
the plastic parts, if any of these positions due to injuries and stuck, will
lead to shutdown, it should be kept mold thimble, lubrication guide post (to
choose the most suitable lubricant), and regularly check thimble, guide posts,
etc. are deformed and surface damage, once discovered, to be replaced; after
the completion of a production cycle, to work on the mold surface sports,
professional guide member coated anti-rust oil, in particular should pay
attention to the strength of the stretch with a gear rack mold bearing parts
and springs mold protection, to ensure that it is always in top working
condition; as production lasted cooling channels easily deposited scale, rust,
silt and algae, so that the cooling passage section becomes smaller, the
cooling channel narrows significantly reduce the rate of heat exchange between
the coolant and the mold, increasing production costs, so clean-up of the flow
channel attention should be paid; for hot runner mold, the maintenance of
heating and control systems help prevent the production of faults, and
therefore particularly important. Therefore, all deal with the end of each
production cycle with a heater on the mold, rod-type heater, heated probe and
thermocouple measurements with an ohmmeter, if damaged, must be replaced, and
the mold resume comparison, make a record, so that timely detection of
problems, take countermeasures.
So do the last part
of the mold surface is maintained, and the so-called surface is to prevent
corrosion, and therefore, the choice of a suitable, high-quality,
professional-rust oil is particularly important. When the mold production
tasks, should be taken different ways, depending on the injection carefully
remove residual injection, available copper, copper and professional mold
cleaners remove residual mold injection molding and other sediments, and air
dried. Disable wire, steel bars and other hard objects to clean up, so as not
to scratch the surface. If rust corrosion caused by injection, to use a grinder
polishing and spray on a professional anti-rust oil, and then the mold in a
dry, cool, no dust at the store.